Internal Concrete Floor Alterations — Industrial
Concrete floor alterations within an existing industrial unit. Cost management and final account on a small but technically specific package. Why we feature it: Demonstrates we apply the same commercial rigour at any scale — small, fast packages delivered with the same discipline as larger schemes.
Project Value
£30k
Duration
2 weeks
Project Scope
On budget
Client:
Confidential
Location
Confidential, UK
Sector
Industrial
Completion
2025
The Challenge
Even a small internal concrete package requires proper commercial management — without it, costs creep and final accounts drag on.
Managing cost certainty on a small, fast-track package
Closing the final account cleanly within the tight programme
Applying full commercial rigour at a scale most QS firms won't touch
Our Approach
01
Cost Planning
Clear cost plan established upfront so the client had full budget visibility from day one.
02
Valuations
Valuations issued promptly against measured progress throughout the works.
03
Final Account
Final account agreed and closed cleanly immediately after practical completion.
Key Performance Metrics
£30k
Package value delivered on budget
2
Weeks — programme met
100%
Accounts closed cleanly
Technology & Tools
Cost Planning
Feasibility to final account
Measurement
Measured progress valuations
Reporting
Clean account closure
"Small job, same professionalism as a much bigger scheme — cost was clear from day one and the final account was closed immediately."
Client Representative
Industrial Sector, UK